LANCASTER CITY LANCASTER COUNTY, PA BOX AREA 64 HOUSE FIRE 451 HIGH STREET Reported working house fire, multiple calls of fire thru the roof.
BOX ASSIGNMENT ENGINE 2, 1, 3 TRUCK 1 MEDIC 612-3 AMBULANCE 612-1
Batt. 4 O/S with heavy fire showing from the 1st & 2nd Divisions, Transmitting the 2nd & 3rd Alarm on arrival.
Command reporting one trapped
Command transmitting the General Alarm on the BOX
Truck 1 ordered to start throwing ladders on arrival.
Command reporting all victims are accounted for.
City PD checking exposures for people still inside.
E3 to hit a plug on arrival.
Command reporting to E2 that they got the plug open.
Interior asking for more pressure.
Command reporting to all units that live wire are down and more might drop.
Interior asking for water.
ALL MEMBER TO EVACUATE THE BUILDING...
Units are going heavy duty at this time.
E1 to charge their 2 1/2 line.
EMS requested for something.
Command requesting Volunteer cover companies into the city.
|
|
|
Post by PUMP on Feb 18, 2007 3:47:44 GMT -5
Command reporting wires are arcing
TRANSFER ASSIGNMENT ENGINE 66-1 to the 1 House
2ND HOUSE FIRE
LANCASTER CITY LANCASTER COUNTY, PA BOX AREA 64 HOUSE FIRE 117 GREEN STREET
BOX ASSIGNMENT ENGINE 4, 24-1, 63-1 LADDER 24, 63 MEDIC 612
Capt. 4 taking the Green Street house fire, all unts going to operate off 33.82
Interior reporting heavy fire on the 3rd Division, E2 to charge their line.
FIRST 20MIN MARK STARTED @ 0350hrs.
RUNNING EXTRA TO THE GREEN STREET HOUSE FIRE. ENGINE 5
ADD TO HIGH STREET RESCUE SQUAD 66 FOR THE AIR
Deck gun needed on side D
Op's reporting they dont have enough water to charge the line.
Crews to evacuate the building, having water issues.
GREEN STREET CALL CLEARED, NO FIRE
|
|
|
Post by PUMP on Feb 18, 2007 3:58:03 GMT -5
Command requesting 1 Add'l Engines to the High Street Incident. Needs that engine to drop a supply line from strawberry street to Engine 1.
ADD ENGINE 5
Fire showing from the Charlie side of the exposure building.
PP&L needed with a rush for wires about to come down, needs power cut.
Companies going to the roof to open up... sounds like they got exposure buildings on fire.
Op's got a 2 1/2 flowing on Delta side of the building.
E1 starting to make a knock on the Delta Side.
Multiple lines working.
ADD FM 4
No crews to the roof.
TRANSFER ASSIGNMENT ENGINE 63-3 to the 3 House LADDER 24 to the 3 House
All companies to start making a knock in the original fire building, wood beams are burnt through. Command ordering no interior attacks on the fire building.
E5 still searching for a plug.
|
|
|
Post by PUMP on Feb 18, 2007 4:10:28 GMT -5
First 20 min mark reached @ 0409Hrs.
PAR checks in progress.
ADD FM 2 MEDIC 100
T1 to start opening up the exposure roof, stop the spread of fire.
Communications checking PAR at this time.
ALL HANDS WORKING
ADD MEDIC 612-5, 612-8
T1 has the roof opened, checking for more extension.
2ND 20 MIN MARK EXPIRED @ 0429Hrs.
E1 needs to shut down, needs to relocate due to the powerlines above it ready to fall.
Op's requesting a crew of 3 to be the RIC team on Side Alpha
|
|
|
Post by PUMP on Feb 18, 2007 8:00:46 GMT -5
UNITS STILL OPERATING @ 0800Hrs. ENGINE 1, 2, 5 TRUCK 1 FIRE MARSHALL 3, 4 RESCUE SQUAD 66 MEDIC 612-3
|
|